← Back to map
NZ InfraWatch
Infrastructure exposure report
Generated 2026-08-30

Wellington: infrastructure exposure

12 tracked projects · $11.9b total pipeline value

12Projects
$11.9bTotal value
$5.6bAt election risk
71/100Avg. delivery confidence

Projects by value

ProjectStatusValueCompletionScoreElection risk
Wellington Transport Package (SH1 Improvements) Planning $3.8b 2033 54 High
Ōtaki to North of Levin (Ō2NL) Under Construction $2.1b 2029 90 Low
Interislander: New Cook Strait Ferries Under Construction $1.9b 2029 83 Low
Petone to Grenada Link Road (Wellington RoNS) Planning $1.8b 2035 42 Extreme
Cook Strait HVDC Cable Replacement Planning $1.1b TBC 81 Safe
SH2 Melling Interchange Under Construction $743m 2031 89 Low
Wellington International Airport Expansion Planning $500m 2028 71 Safe
Wellington Water Infrastructure Renewals Under Construction Value TBC 2030 79 Safe
CentrePort Wellington: Port Resilience Programme Under Construction Value TBC TBC 85 Safe
2nd Mt Victoria Tunnel Planning Value TBC TBC 60 Medium
Basin Reserve Transport Improvements Planning Value TBC TBC 60 Medium
2nd Terrace Tunnel Planning Value TBC TBC 60 Medium
Sources & methodology. Project data from Te Waihanga's National Infrastructure Pipeline and public records. The Delivery Confidence Score is a transparent ranking (see https://www.infrawatch.nz/methodology/delivery-confidence/). Approximations are flagged; no figures are fabricated. © 2026 NZ InfraWatch.