← Back to map
NZ InfraWatch
Infrastructure exposure report
Generated 2026-08-30

Bay of Plenty: infrastructure exposure

6 tracked projects · $4.9b total pipeline value

6Projects
$4.9bTotal value
$3bAt election risk
72/100Avg. delivery confidence

Projects by value

ProjectStatusValueCompletionScoreElection risk
Tauriko West & SH29 (Tauranga RoNS) Planning $3b 2033 47 High
Takitimu North Link Stage 1: Tauranga to Te Puna Under Construction $933m 2028 90 Low
Te Rahui Solar Farm: Rangitāiki Under Construction $700m 2027 97 Safe
Tauranga City Centre Refresh Under Construction $306m 2028 81 Low
Tauranga Hospital Redevelopment Planning Value TBC 2034 57 Medium
Stella Passage Development: Port of Tauranga Planning Value TBC TBC 57 Safe
Sources & methodology. Project data from Te Waihanga's National Infrastructure Pipeline and public records. The Delivery Confidence Score is a transparent ranking (see https://www.infrawatch.nz/methodology/delivery-confidence/). Approximations are flagged; no figures are fabricated. © 2026 NZ InfraWatch.